Home / Services / Net Metering
Net Metering ServicesNet Metering Services in Haryana — Full DISCOM Approval Assistance
As a dedicated net metering service provider in Haryana, we handle your entire net meter installation and DISCOM approval process — from application to commissioning — so your solar savings start without delay.
↓
Your Property Load
↓
Surplus → Grid Export
↓
📟 Bidirectional Net Meter
↓
DISCOM Credit
↓
💰 Lower Electricity Bill
Solar Net Metering Haryana — Explained
Net metering is the billing arrangement that makes on-grid and hybrid solar systems financially worthwhile. A special bidirectional meter is installed at your property, which measures both the electricity you draw from the grid and the surplus solar power you export back to it.
At the end of each billing cycle, your DISCOM (UHBVN or DHBVN, depending on your area) calculates the net difference between what you consumed and what you exported — and you're billed only for that net amount, or credited if you exported more than you used.
How Net Metering Works, Step by Step
Solar Powers Your Load
Your property uses solar power directly during the day.
Surplus Exported to Grid
Excess generation is sent back to the DISCOM grid.
Bidirectional Meter Records Both
Tracks units imported and units exported separately.
Net Billing Applied
You're billed only for the net units consumed.
Benefits of Net Metering
Maximised Bill Savings
Every exported unit reduces your net electricity bill.
Faster Payback
Credited exports significantly shorten your investment payback period.
Subsidy Requirement
Net metering is mandatory to claim the PM Surya Ghar subsidy.
Fair, Transparent Billing
You only pay for what you actually consume from the grid.
No Battery Needed
The grid effectively acts as free storage for your surplus power.
Supports Clean Energy
Encourages higher solar adoption across the grid.
Why Net Metering Is Important for Your Solar System
Without net metering, any solar power you generate but don't immediately use would simply be wasted. On-Grid Solar Net Metering Haryana and Hybrid Solar Net Metering Haryana both rely on this arrangement to convert your surplus generation into real bill savings — making it one of the most important steps in getting the maximum return from your solar investment.
Net Metering Eligibility in Haryana
Required Documents for Net Metering
DISCOM Approval Process
UHBVN
Uttar Haryana Bijli Vitran Nigam handles net metering approvals for northern Haryana districts. We prepare and submit your complete application on your behalf.
DHBVN
Dakshin Haryana Bijli Vitran Nigam handles approvals for southern Haryana districts. Our team coordinates directly with your local DISCOM office for faster processing.
Step-by-Step Net Metering Process
Application
Documents prepared & submitted to DISCOM
Document Verification
DISCOM reviews your application
Site Inspection
Technical inspection of your installed system
Agreement Signing
Net metering agreement finalised
Meter Installation
Bidirectional net meter installed
Commissioning
Net billing becomes active
Common Reasons for Approval Delays
Incomplete Documentation
Missing or mismatched paperwork is the most common cause of delay.
Load Capacity Mismatch
Solar system size exceeding the sanctioned connection load.
Inspection Scheduling
Delays in booking or completing the DISCOM site inspection.
Technical Discrepancies
Errors in the single line diagram or equipment specifications.
We prepare and double-check every document before submission to minimise these delays for you.
Net Metering Charges & Timeline
Indicative figures — exact charges and timelines are set by your DISCOM and confirmed during your application.
| Stage | Typical Duration | Notes |
|---|---|---|
| Application Submission | 1-2 days | Documents prepared by our team |
| DISCOM Verification | 7-15 days | Varies by DISCOM workload |
| Site Inspection | 7-15 days | Scheduled by DISCOM officials |
| Meter Installation | 3-7 days | After agreement is signed |
| Total Approval Timeline | ~4-6 weeks | Indicative, can vary by location |
Why Choose Shreeman Solar Industries
End-to-End Assistance
We manage your entire net metering application, start to finish.
Direct DISCOM Coordination
We liaise directly with UHBVN/DHBVN on your behalf.
Accurate Documentation
Correctly prepared SLDs and paperwork to avoid delays.
Faster Turnaround
Our experience helps reduce approval waiting times.
Post-Approval Support
We remain available if any billing issues arise later.
Clear Communication
Regular updates so you always know your application status.
Customer Success Stories
"Our net metering approval came through faster than we expected — the team handled every DISCOM follow-up for us."
"We had a documentation issue with a previous vendor. Shreeman Solar fixed it and got our net meter approved within weeks."
"Very transparent about the timeline from day one. No surprises, no unexplained delays."
Net Metering — Your Questions Answered
Typically around 4-6 weeks from application to commissioning, though this can vary depending on your DISCOM's workload and how quickly documents are verified.
Yes, a net metering connection is required to claim the PM Surya Ghar government subsidy for grid-connected residential solar systems.
Net meter charges are typically set by the DISCOM. We inform you of the exact applicable charges upfront before application.
No, net metering only applies to grid-connected systems — on-grid and hybrid setups. Purely off-grid systems are not connected to the DISCOM grid.
Rejections are usually due to documentation or technical discrepancies. We identify the issue, correct it, and resubmit the application on your behalf.
Get Net Metering Assistance Today
Let us handle your entire DISCOM application, documentation and approval process — completely hassle-free.