    What Is Net Metering?

    Solar Net Metering Haryana — Explained

    Net metering is the billing arrangement that makes on-grid and hybrid solar systems financially worthwhile. A special bidirectional meter is installed at your property, which measures both the electricity you draw from the grid and the surplus solar power you export back to it.

    At the end of each billing cycle, your DISCOM (UHBVN or DHBVN, depending on your area) calculates the net difference between what you consumed and what you exported — and you're billed only for that net amount, or credited if you exported more than you used.

    How It Works

    How Net Metering Works, Step by Step

    1

    Solar Powers Your Load

    Your property uses solar power directly during the day.

    2

    Surplus Exported to Grid

    Excess generation is sent back to the DISCOM grid.

    3

    Bidirectional Meter Records Both

    Tracks units imported and units exported separately.

    4

    Net Billing Applied

    You're billed only for the net units consumed.

    Benefits

    Benefits of Net Metering

    💰

    Maximised Bill Savings

    Every exported unit reduces your net electricity bill.

    📉

    Faster Payback

    Credited exports significantly shorten your investment payback period.

    📋

    Subsidy Requirement

    Net metering is mandatory to claim the PM Surya Ghar subsidy.

    ⚖️

    Fair, Transparent Billing

    You only pay for what you actually consume from the grid.

    🔋

    No Battery Needed

    The grid effectively acts as free storage for your surplus power.

    🌱

    Supports Clean Energy

    Encourages higher solar adoption across the grid.

    Why It Matters

    Why Net Metering Is Important for Your Solar System

    Without net metering, any solar power you generate but don't immediately use would simply be wasted. On-Grid Solar Net Metering Haryana and Hybrid Solar Net Metering Haryana both rely on this arrangement to convert your surplus generation into real bill savings — making it one of the most important steps in getting the maximum return from your solar investment.

    Eligibility

    Net Metering Eligibility in Haryana

    Property must have an active, registered DISCOM electricity connection
    Solar system must be on-grid or hybrid (grid-connected) type
    Solar system capacity generally should not exceed the sanctioned load of the connection
    Installed equipment must meet DISCOM's technical and safety standards
    Applicable for residential, commercial, industrial and institutional connections
    Documents Required

    Required Documents for Net Metering

    📄
    Latest Electricity Bill Copy
    🪪
    ID Proof (Aadhaar/PAN)
    🏠
    Address / Ownership Proof
    📐
    Single Line Diagram (SLD)
    🧾
    Solar Equipment Invoice
    Signed Net Metering Application
    DISCOM Net Metering Haryana

    DISCOM Approval Process

    UHBVN

    Uttar Haryana Bijli Vitran Nigam handles net metering approvals for northern Haryana districts. We prepare and submit your complete application on your behalf.

    DHBVN

    Dakshin Haryana Bijli Vitran Nigam handles approvals for southern Haryana districts. Our team coordinates directly with your local DISCOM office for faster processing.

    Our Process

    Step-by-Step Net Metering Process

    1

    Application

    Documents prepared & submitted to DISCOM

    2

    Document Verification

    DISCOM reviews your application

    3

    Site Inspection

    Technical inspection of your installed system

    4

    Agreement Signing

    Net metering agreement finalised

    5

    Meter Installation

    Bidirectional net meter installed

    6

    Commissioning

    Net billing becomes active

    Avoiding Delays

    Common Reasons for Approval Delays

    ⚠️

    Incomplete Documentation

    Missing or mismatched paperwork is the most common cause of delay.

    ⚠️

    Load Capacity Mismatch

    Solar system size exceeding the sanctioned connection load.

    ⚠️

    Inspection Scheduling

    Delays in booking or completing the DISCOM site inspection.

    ⚠️

    Technical Discrepancies

    Errors in the single line diagram or equipment specifications.

    We prepare and double-check every document before submission to minimise these delays for you.

    Charges & Timeline

    Net Metering Charges & Timeline

    Indicative figures — exact charges and timelines are set by your DISCOM and confirmed during your application.

    StageTypical DurationNotes
    Application Submission1-2 daysDocuments prepared by our team
    DISCOM Verification7-15 daysVaries by DISCOM workload
    Site Inspection7-15 daysScheduled by DISCOM officials
    Meter Installation3-7 daysAfter agreement is signed
    Total Approval Timeline~4-6 weeksIndicative, can vary by location
    Why Choose Us

    Why Choose Shreeman Solar Industries

    📋

    End-to-End Assistance

    We manage your entire net metering application, start to finish.

    📞

    Direct DISCOM Coordination

    We liaise directly with UHBVN/DHBVN on your behalf.

    📐

    Accurate Documentation

    Correctly prepared SLDs and paperwork to avoid delays.

    ⏱️

    Faster Turnaround

    Our experience helps reduce approval waiting times.

    🔄

    Post-Approval Support

    We remain available if any billing issues arise later.

    💬

    Clear Communication

    Regular updates so you always know your application status.

    Success Stories

    Customer Success Stories

    ★★★★★

    "Our net metering approval came through faster than we expected — the team handled every DISCOM follow-up for us."

    S
    Sandeep L.Gurugram
    ★★★★★

    "We had a documentation issue with a previous vendor. Shreeman Solar fixed it and got our net meter approved within weeks."

    R
    Rekha J.Faridabad
    ★★★★★

    "Very transparent about the timeline from day one. No surprises, no unexplained delays."

    M
    Meena K.Mahendragarh
    FAQs

    Net Metering — Your Questions Answered

    How long does net metering approval take in Haryana? +

    Typically around 4-6 weeks from application to commissioning, though this can vary depending on your DISCOM's workload and how quickly documents are verified.

    Is net metering mandatory for solar subsidy? +

    Yes, a net metering connection is required to claim the PM Surya Ghar government subsidy for grid-connected residential solar systems.

    Who pays for the net meter installation? +

    Net meter charges are typically set by the DISCOM. We inform you of the exact applicable charges upfront before application.

    Can off-grid systems get net metering? +

    No, net metering only applies to grid-connected systems — on-grid and hybrid setups. Purely off-grid systems are not connected to the DISCOM grid.

    What happens if my net metering application gets rejected? +

    Rejections are usually due to documentation or technical discrepancies. We identify the issue, correct it, and resubmit the application on your behalf.

    Get Started

    Get Net Metering Assistance Today

    Let us handle your entire DISCOM application, documentation and approval process — completely hassle-free.

    Message on WhatsApp Call Now
    Scroll to Top